Azerbaijan Landing Permits

We leverage partnerships with 2,500+ suppliers worldwide to secure

Azerbaijan Landing Permits

Azerbaijan Landing Permits Situation

Before flying to Azerbaijani airports, all foreign-registered aircraft must obtain landing permits from the State Civil Aviation Agency of Azerbaijan (SCAA). 

Afghanistan Landing Permits
Afghanistan Landing Permits

Azerbaijan Overflight & Landing Permits

Streamlined Approval Process Global Regulatory Compliance

Azerbaijan Landing Permits Requirements

This applies to:

  • Commercial passenger flights
  • Cargo operations
  • Private/charter flights
  • Technical/special flights

Key Considerations

  • Strategic Location: Between Europe and Asia
  • Operating Airports: Mainly Zvartnots (EVN) and Shirak (LWN)
  • Processing Time: Typically 3-5 business days
  • Documentation: Strict adherence to requirements essential

When correctly planned, the landing permission process in Azerbaijan enables effective connectivity between Europe and Asia, but it does require meticulous preparation.

Expert guidance helps optimize approval timelines while navigating regulatory restrictions.

Contact The Network Plan, your go-to aviation permit expert with SCAA knowledge, for help obtaining landing permits in Azerbaijan .

Our services address these pain points, providing 24/7 Azerbaijan Landing Permit tailored to your operational needs.

Request Form

Grow Your Business In No Time

Lorem ipsum dolor sit amet consectetur adipiscing elit dolor

Azerbaijan Landing Permits

The Aviation Global Transportation System

Aviation services are essential for the global transportation system, offering a wide range of operations that ensure the safe and efficient movement of passengers and cargo.

Key areas of aviation services include:

  • Passenger Transport: Domestic and international flight operations for travelers.
  • Cargo Services: Safe and timely delivery of goods and freight.
  • Ground Handling: Includes baggage handling, aircraft cleaning, towing, pushback, and marshalling.
  • Aircraft Maintenance: Regular inspections and repairs to ensure airworthiness.
  • Refueling Services: Timely and safe aircraft fueling operations.
  • Catering Services: In-flight meals and beverage provision for passengers and crew.
  • Air Traffic Control: Monitoring and managing aircraft movements to ensure flight safety.
  • Customer Services: Check-in, boarding, and assistance at the airport.
  • Security Services: Passenger and baggage screening for safety compliance.
  • Emergency Support: Medical aid and fire safety readiness.

These services support airline operations, boost economic growth, and ensure passenger satisfaction.

SAF & Alternative Fuel Solutions

Landing Permit Requirements

  • Aircraft registration and type
  • Complete schedule (date/times of operation)
  • Route details (entry/exit points)
  • Crew list with license copies (notarized)
  • Valid Air Operator Certificate (AOC)
  • Certificate of Airworthiness
  • Insurance certificate (minimum $75M coverage)
  • Noise certification (Chapter 3/4 compliance)
  • Handling agent confirmation in Azerbaijan
  • For charter flights: Local sponsor invitation letter
  • Passenger manifest for commercial flights
  • Cargo manifest for freight operations
    • Oman CAA overflight fees paid in advance

Why Choose Us

Why Choose The Network Plan?

Navigating international aviation regulations requires precision. We handle:

ISAGO & IATA

ISAGO & IATA-certified handlers

Cost transparency

Cost transparency with no hidden fees

24/7 support

24/7 support for delays or diversions

Sustainability

Electric GSE and waste reduction programs

Application Process

Submission Methods
  1. Direct to SCAA:
  2. Processing Steps:
    • Complete SCAA application form
    • Submit all required documents
    • Pay applicable fees
    • Receive permit via email (typically PDF)

Operational Considerations

Airport Specifications
  • Heydar Aliyev International (GYD):
    • Runway: 16/34 (3,700m)
    • CAT II ILS available
    • 24/7 operations
  • Regional Airports:
    • Limited handling capabilities
    • Prior coordination required
Special Restrictions
  • Night operations permitted at GYD
  • Dangerous goods require 72-hour prior notice
  • Military zones to avoid
  • Special procedures for flights to Nakhichevan

Why Use Professional Permit Services?

Engaging specialists like The Network Plan provides:

  1. 95% First-Time Approval Rate
  2. Local SCAA Contacts for faster processing
  3. Document Verification to prevent rejections
  4. 24/7 Application Monitoring
  5. Cost Optimization strategies

Tips for Successful Applications

  1. Apply at least 10 business days in advance
  2. Ensure all documents are properly notarized
  3. Verify insurance meets Azerbaijan requirements
  4. Confirm handling arrangements before applying
  5. Check NOTAMs for temporary restrictions

Our Specialized Services

✔ Risk Assessment & Mitigation Planning


✔ Diplomatic Channel Coordination


✔ Emergency Contingency Development


✔ Alternative Route Optimization

Post-Approval Requirements

  1. Final Manifest Submission: 24 hours before flight

  2. Security Briefing: Mandatory for crew

  3. Handling Confirmation: From approved ground agent

  4. Payment Verification: All fees must be cleared

  5. Last-Minute NOTAM Check: Essential before departure

Optimize Your Azerbaijan Landing Permit Strategy Today

At The Network Plan, we specialize in securing Azerbaijan Civil Aviation Authority (CAA) overflight permits, ensuring smooth and compliant crossings for commercial, private, and cargo flights

Contact us for a Azerbaijan Landing Permit audit or to discuss custom supply agreements!