Somalia Landing Permits

We leverage partnerships with 2,500+ suppliers worldwide to secure

Somalia Landing Permits

Somalia’s aviation sector is regulated by the Somali Civil Aviation Authority (SCAA), which requires all foreign aircraft to obtain landing permits. Due to security concerns, the approval process involves multiple government agencies.

Key Facts:

  • Main international airports: Aden Adde (MGQ), Hargeisa (HGA)
  • Processing time: 5-10 business days (longer for first-time operators)
  • Validity period: 72 hours (extensions rarely granted)
  • Special security requirements: Mandatory for all flights
Afghanistan Landing Permits
Afghanistan Landing Permits

Somalia Overflight & Landing Permits

Streamlined Approval Process Global Regulatory Compliance

Landing Permit Requirements

Mandatory Documentation:

✔ Completed SCAA application form
✔ Air Operator Certificate (AOC)
✔ Certificate of Airworthiness
✔ Insurance Certificate (minimum $1 billion coverage)
✔ Crew licenses and medical certificates
✔ Aircraft registration documents
✔ Detailed flight schedule

Our services address these pain points, providing 24/7 Somalia Landing Permit tailored to your operational needs.

Request Form

Grow Your Business In No Time

Lorem ipsum dolor sit amet consectetur adipiscing elit dolor

Somalia Landing Permits

Additional Requirements by Flight Type:

 

Flight Type

Special Documents Needed

Commercial

Passenger manifest, security clearance

Charter

Operator authorization, payment proof

Cargo

Detailed cargo manifest, dangerous goods cert (if applicable)

Private

Owner affidavit, purpose of visit

UN/NGO

Mission approval letter

SAF & Alternative Fuel Solutions

Landing Permit Requirements

  • Aircraft registration and type
  • Complete schedule (date/times of operation)
  • Route details (entry/exit points)
  • Crew list with license copies
  • Valid Air Operator Certificate (AOC)
  • Certificate of Airworthiness
  • Insurance certificate (minimum M coverage)
  • Noise certification
  • Handling agent confirmation from BAH
  • For charter flights: Bahraini sponsor letter
  • Passenger manifest (for commercial flights)
  • Cargo manifest (if applicable)
    • Oman CAA overflight fees paid in advance

Why Choose Us

Why Choose The Network Plan?

Navigating international aviation regulations requires precision. We handle:

ISAGO & IATA

ISAGO & IATA-certified handlers

Cost transparency

Cost transparency with no hidden fees

24/7 support

24/7 support for delays or diversions

Sustainability

Electric GSE and waste reduction programs

Operational Restrictions & Security Measures

Key Restrictions:

⚠ Mogadishu Airport (MGQ):

  • No night operations (curfew from 18:00-06:00)
  • Mandatory armed escort for all aircraft
  • Limited fuel availability (request 72h in advance)

⚠ Hargeisa Airport (HGA):

  • Separate permit required for Somaliland
  • Different fee structure than southern Somalia

Security Protocols:

  • All passengers screened by NISA (National Intelligence)
  • No photography within 5km of airports
  • Mandatory security briefing upon arrival

Practical Tips for Operators

  1. Use approved local handlers:
    • Mogadishu: Dallo Airlines, African Express Airways
    • Hargeisa: Jubba Airways
  2. Alternate airports:
    • Berbera (HCMB) – better facilities than Hargeisa
    • Djibouti (HDAM) – emergency diversion airport
  3. Critical reminders:
    • All documents must be in English or Arabic
    • Carry 5 extra copies of all permits
    • Arrive with full fuel tanks when possible

      Current Challenges

      Operators report:

      • Last-minute permit cancellations during political unrest
      • Extended security screenings (add 2-3 hours to turnaround)
      • Limited ground support at regional airports
      • Frequent NOTAM changes affecting operations

Why Use Professional Permit Services?

Engaging specialists like The Network Plan provides:

  1. 99% Approval Rate
  2. Average 2-10Day Processing
  3. Local CAA Contacts
  4. Document Preparation Assistance
  5. 24/7 Application Tracking

Application Process

Step-by-Step Approval Process:

  1. Submit application via email to SCAA 
  2. Security clearance (Ministry of Civil Aviation & Ministry of Internal Security)
  3. Slot coordination (strict controls at MGQ)
  4. Fee payment (wire transfer only)
  5. Final approval (issued 24-48 hours before flight)
Tips for Successful Applications
  1. Apply at least 5 business days in advance
  2. Triple-check all document requirements
  3. Confirm handling arrangements before applying
  4. Verify insurance meets Somalia requirements
  5. Check NOTAMs for temporary restrictions

Successful Somalia Operations

While challenging, Somalia operations are manageable with proper preparation:
✔ Apply at least 10 days in advance
✔ Budget for higher-than-average fees
✔ Plan for extensive security protocols
✔ Maintain schedule flexibility

For professional permit assistance, contact The Network Plan.

Our Specialized Services

✔ Risk Assessment & Mitigation Planning


✔ Diplomatic Channel Coordination


✔ Emergency Contingency Development


✔ Alternative Route Optimization

Post-Approval Requirements

  1. Final Manifest Submission: 24 hours before flight

  2. Security Briefing: Mandatory for crew

  3. Handling Confirmation: From approved ground agent

  4. Payment Verification: All fees must be cleared

  5. Last-Minute NOTAM Check: Essential before departure

Optimize Your Somalia Landing Permits Strategy Today

At The Network Plan, we specialize in securing Somalia Civil Aviation Authority (CAA) overflight permits, ensuring smooth and compliant crossings for commercial, private, and cargo flights

Contact us for a Somalia Landing Permit audit or to discuss custom supply agreements!