Eritrea landing permits

We leverage partnerships with 2,500+ suppliers worldwide to secure

Eritrea landing permits

Eritrea maintains strict controls over airspace access, requiring all foreign aircraft to obtain landing permits through the Eritrean Civil Aviation Authority (ECAA). This guide covers everything operators need to know about securing flight permissions to Eritrea’s airports.

Key Facts:

  • Single international airport: Asmara International (ASM)
  • Primary authority: Eritrean Civil Aviation Authority
  • Processing time: 5-7 business days minimum
  • Validity: Typically 72 hours from approved slot
Afghanistan Landing Permits
Afghanistan Landing Permits

Eritrea Overflight & Landing Permits

Streamlined Approval Process Global Regulatory Compliance

Landing Permit Requirements

Mandatory Documentation:

  • Completed ECAA application form
  • Air Operator Certificate (AOC)
  • Certificate of Airworthiness
  • Noise Certificate
  • Insurance Certificate (minimum $500M coverage)
  • Crew licenses and medical certificates
  • Aircraft registration documents

Special Requirements:

✔ Military/state aircraft: Additional diplomatic clearance
✔ Charter flights: Proof of passenger manifest
✔ Cargo flights: Detailed commodity description
✔ Private jets: Owner/operator verification

Our services address these pain points, providing 24/7 Eritrea Landing Permit tailored to your operational needs.

Request Form

    Grow Your Business In No Time

    Fast, reliable, and effective – helping your business grow in no time.

    Eritrea landing permits

    Application Process

    Step-by-Step Procedure:

    1. Submit application (via handler or directly to ECAA)
    2. Security clearance (Ministry of Foreign Affairs review)
    3. Slot coordination (Asmara Airport only)
    4. Fee payment (varies by aircraft type)
    5. Permit issuance (typically 72 hours before flight)

    Processing Timeline:

    Flight Type

    Lead Time

    Scheduled commercial

    7 days

    Charter

    5 days

    Cargo

    4 days

    Private

    3 days

    SAF & Alternative Fuel Solutions

    Landing Permit Requirements

    • Aircraft registration and type
    • Complete schedule (date/times of operation)
    • Route details (entry/exit points)
    • Crew list with license copies
    • Valid Air Operator Certificate (AOC)
    • Certificate of Airworthiness
    • Insurance certificate (minimum $100M coverage)
    • Noise certification
    • Handling agent confirmation from BAH
    • For charter flights: Bahraini sponsor letter
    • Passenger manifest (for commercial flights)
    • Cargo manifest (if applicable)
      • Oman CAA overflight fees paid in advance

    Why Choose Us

    Why Choose The Network Plan?

    Navigating international aviation regulations requires precision. We handle:

    ISAGO & IATA

    ISAGO & IATA-certified handlers

    Cost transparency

    Cost transparency with no hidden fees

    24/7 support

    24/7 support for delays or diversions

    Sustainability

    Electric GSE and waste reduction programs

    Operational Restrictions

    Asmara Airport Limitations:

    • No night operations (sunset to sunrise)
    • Maximum parking: 3 wide-body aircraft
    • Fuel availability: Prior notice required
    • Security screening: Mandatory armed guard

    Special Considerations:

    ⚠️ Sanctions compliance: Verify current UN restrictions
    ⚠️ Military zones: Avoid restricted airspace
    ⚠️ Diplomatic clearances: Required for government flights

     Practical Tips for Operators

    1. Use local handlers: ECAA prefers applications through:
      • Eritrean Airlines (for commercial)
      • Nasair (for charters)
      • DHL Aviation (for cargo)
    2. Slot confirmation: Asmara has strict slot controls – obtain before permit application
    3. Alternate airports: No viable alternates within Eritrea – plan for:
      • Khartoum (HSSS)
      • Jeddah (OEJN)
    4. Document translation: All materials must be in English or Tigrinya

    Current Challenges

    Operators report:

    • Extended processing times during political events
    • Last-minute cancellations without explanation
    • Limited ground support availability
    • Bureaucratic hurdles for private flights

    Successful Eritrea Operations

    While Eritrea maintains strict aviation controls, proper preparation ensures smooth permit approval:
    ✔ Apply early with complete documentation
    ✔ Use experienced local handlers
    ✔ Confirm all operational restrictions
    ✔ Maintain flexibility for schedule changes

    For professional permit assistance, contact The Network Plan.

    Our Specialized Services

    ✔ Risk Assessment & Mitigation Planning


    ✔ Diplomatic Channel Coordination


    ✔ Emergency Contingency Development


    ✔ Alternative Route Optimization

    Post-Approval Requirements

    1. Final Manifest Submission: 24 hours before flight

    2. Security Briefing: Mandatory for crew

    3. Handling Confirmation: From approved ground agent

    4. Payment Verification: All fees must be cleared

    5. Last-Minute NOTAM Check: Essential before departure

    Optimize Your Eritrea landing permit Strategy Today

    At The Network Plan, we specialize in securing Eritrea Civil Aviation Authority (CAA) overflight permits, ensuring smooth and compliant crossings for commercial, private, and cargo flights

    Contact us for a Eritrea Landing Permit audit or to discuss custom supply agreements!