Gambia landing permits

We leverage partnerships with 2,500+ suppliers worldwide to secure

Gambia landing permits

The Gambia Civil Aviation Authority must provide permission to operate flights to the Gambia (GCAA). Gambia maintains particular entrance criteria for foreign aircraft since it is a well-liked West African destination with rising aviation activity.

Everything operators need to know about landing permits in the Gambia is covered in this extensive reference, which also includes the most recent laws for 2024, application processes, costs, and professional advice for seamless approvals.

Afghanistan Landing Permits
Afghanistan Landing Permits

Gambia Overflight & Landing Permits

Streamlined Approval Process Global Regulatory Compliance

What is a Gambia Landing Permit?

A Gambia landing permit is official authorization from the GCAA that allows foreign-registered aircraft to land at Banjul International Airport (GBYD/BJL). This mandatory permit applies to:

✔ Private and business jets
✔ Charter flights (passenger and cargo)
✔ Non-scheduled commercial operations
✔ Humanitarian/medevac flights
✔ Technical stops exceeding 2 hours

When is a Landing Permit Required?

You must obtain a Gambia landing permit if your flight:
✔ Is non-scheduled (not part of regular airline service)
✔ Uses foreign aircraft registration
✔ Intends to land at Banjul International Airport

Exemptions: Scheduled commercial airlines under bilateral agreements may be exempt but must file flight plans.

When Do You Need an Gambia Landing Permit?

You need an Gambia landing permit if you are operating:
Private flights (general aviation)
Charter flights (non-scheduled commercial flights)
Cargo flights
Military or diplomatic flights
Emergency or medical evacuation flights

An aircraft can land at any airport in Gambia with a landing permit, which is an official license from the Civil Aviation Authority (CAA) of Gambia . All non-scheduled, private, and charter flights require this authorization.

Because their activities are covered by bilateral agreements, commercial airlines that operate regularly scheduled flights do not require a special permission.

Our services address these pain points, providing 24/7 Gambia Landing Permit tailored to your operational needs.

Request Form

Grow Your Business In No Time

Lorem ipsum dolor sit amet consectetur adipiscing elit dolor

Gambia landing permits

Application Process: Step-by-Step Guide

1. Preparation Phase

  • Gather all required documents (English language accepted)
  • Verify all certificates have sufficient validity
  • Secure handling arrangements with local agent

2. Submission Methods

  • Direct to GCAA: via official email
  • Through Authorized Handling Agent: Highly recommended
  • Online Submission: Available through GCAA portal

3. Processing Timelines

  • Standard Processing: 3-5 business days
  • Express Service: 48 hours (+50% fee)
  • Emergency Requests: 24 hours (+100% fee)

4. Approval & Payment

  • Electronic permit issuance via email
  • Fees must be paid in full before activation
  • GMD or USD payments accepted
SAF & Alternative Fuel Solutions

Landing Permit Requirements

  • Flight itinerary (departure & arrival details)
  • Aircraft registration details
  • Airworthiness certificate
  • Noise certificate (if applicable)
  • Insurance certificate (covering third-party liability)
  • Crew & passenger manifests
  • Purpose of flight (tourism, business, medical, etc.)
  • Exact date/time of arrival/departure

  • Handling agent confirmation in Afghanistan

  • Security arrangements plan

  • Local sponsor details (for non-scheduled flights)

  •  
  • Military flights: Requires diplomatic clearance.
  • Medical flights: May need approval from Oman’s Ministry of Health.
    • Oman CAA overflight fees paid in advance

Why Choose Us

Why Choose The Network Plan?

Navigating international aviation regulations requires precision. We handle:

ISAGO & IATA

ISAGO & IATA-certified handlers

Cost transparency

Cost transparency with no hidden fees

24/7 support

24/7 support for delays or diversions

Sustainability

Electric GSE and waste reduction programs

Preparing the required paperwork ahead of time makes the process of obtaining an Gambia landing permit simple. Following Gambia aviation laws guarantees a seamless landing whether you’re flying individually or running a charter flight.

To expedite the process, think about collaborating with an airline handling business in Gambia for expert support.

Do you need assistance with your landing permission in Gambia ? For knowledgeable aviation support, go to The Network Plan!

Special Operational Considerations

1. Airport Slot Requirements

  • Banjul International Airport requires prior slots
  • Slot coordination should begin with permit application
  • Minimum 24 hours notice for changes

2. Security Requirements

  • Advanced passenger information required
  • Potential security screening for certain flights

3. Peak Season Planning

  • November-April (tourist season): Apply 7-10 days in advance
  • Major events: Additional lead time required

Why Use a Professional Permit Service?

Key Benefits

✔ 98% first-time approval rate
✔ Direct GCAA connections for faster processing
✔ 24/7 support for urgent requests
✔ Local handling coordination
✔ Real-time application tracking

Important Regulations to Remember

Overflight permits are required if passing through Gambia airspace without landing.
Visa requirements apply for passengers and crew (check Gambia eVisa system).
Restricted zones: Some areas may require additional security clearance.
COVID-19 protocols: Check latest health advisories before travel.

Gambia Landing Permit Requirements Essential Documentation Checklist

  1. Aircraft Information:
    • Complete registration details
    • Aircraft type and ICAO code
    • Maximum Takeoff Weight (MTOW)
    • Call sign
  2. Flight Details:
    • Complete itinerary (origin-destination)
    • Proposed schedule (UTC)
    • Detailed flight purpose
    • Passenger manifest (full names, nationalities, passport numbers)
  3. Operator Information:
    • Company registration documents
    • Air Operator Certificate (AOC) for commercial operators
    • Pilot licenses and medical certificates
  4. Supporting Documents:
    • Valid Certificate of Airworthiness (minimum 6 months validity)
    • Insurance certificate (minimum $1 million liability coverage)
    • Noise certificate
    • Complete crew list with passport copies
    • Handling agreement with approved Gambian ground handler

Frequently Asked Questions

1. How long does approval take?

3-5 business days normally; 24-48 hours for urgent requests.

2. Can I operate without a permit?

No – penalties include fines up to $5,000 and aircraft detention.

3. Are there airport curfews?

Banjul operates 24/7 with noise restrictions 10PM-6AM.

4. Can permits be extended?

No – new application required for changes.

5. What payment methods are accepted?

Bank transfers in GMD or USD.



Optimize Your Gambia Landing Permit Strategy Today

At The Network Plan, we specialize in securing Gambia Civil Aviation Authority (CAA) overflight permits, ensuring smooth and compliant crossings for commercial, private, and cargo flights

Contact us for a Gambia Landing Permit audit or to discuss custom supply agreements!