Georgia Landing permits

We leverage partnerships with 2,500+ suppliers worldwide to secure

Georgia Landing permits

Understanding Georgia’s Landing Permit Requirements

Before flying to Georgian airports, all foreign-registered aircraft must get landing permits from the Civil Aviation Agency of Georgia (GCAA). 

Afghanistan Landing Permits
Afghanistan Landing Permits

Georgia Overflight & Landing Permits

Streamlined Approval Process Global Regulatory Compliance

This applies to

  • Commercial scheduled flights
  • Charter operations (private/business)
  • Cargo flights
  • Technical/special flights

Key Considerations

  • Strategic Location: Between Europe and Asia
  • Main Airports: Tbilisi (TBS), Batumi (BUS), Kutaisi (KUT)
  • Processing Time: 3-5 business days standard
  • Documentation: Strict compliance required

 

Although it needs thorough documentation, Georgia’s landing permission procedure is comparatively efficient.

Simplified clearances and adherence to all Georgian aviation laws are guaranteed with expert help.

The Network Plan is your go-to aviation permit expert with GCAA experience if you need help with a landing permit in Georgia.

Our services address these pain points, providing 24/7 Georgia Landing Permit tailored to your operational needs.

Request Form

Grow Your Business In No Time

Lorem ipsum dolor sit amet consectetur adipiscing elit dolor

Georgia Landing Permits

Georgia Landing Permits Fees

Fee Type

Cost (USD)

Notes

Landing Fee

$400

Based on MTOW

Parking Fee

$150/day

After first 4 hours

Permit Processing

$100

Non-refundable

Overtime Charges

$75/hour

Outside 0900-1800

Payment Methods

  • Bank transfer (preferred)
  • Credit cards (Visa/Mastercard)
  • Through authorized handling agents
SAF & Alternative Fuel Solutions

Landing Permit Requirements

  • Aircraft registration and type
  • Complete schedule (date/times of operation)
  • Route details (entry/exit points)
  • Crew list with license copies
  • Valid Air Operator Certificate (AOC)
  • Certificate of Airworthiness
  • Insurance certificate (minimum $50M coverage)
  • Noise certification
  • Handling agent confirmation from Georgian airport
  • For charter flights: Georgian sponsor letter
  • Passenger manifest (for commercial flights)
  • Cargo manifest (if applicable)
    • Oman CAA overflight fees paid in advance

Why Choose Us

Why Choose The Network Plan?

Navigating international aviation regulations requires precision. We handle:

ISAGO & IATA

ISAGO & IATA-certified handlers

Cost transparency

Cost transparency with no hidden fees

24/7 support

24/7 support for delays or diversions

Sustainability

Electric GSE and waste reduction programs

Application Process

Submission Methods
  1. Direct to GCAA:
  2. Processing Steps:
    • Complete application form
    • Submit all required documents
    • Pay applicable fees
    • Receive permit via email (typically within 3 days)
Processing Timeline
  • Standard Processing: 3 business days
  • Expedited Processing: 24 hours (+50% fee)
  • Charter Flights: 5 business days
  • No Processing on Weekends/Public Holidays

Operational Considerations

Main Airports
  1. Tbilisi International (TBS):
    • Runway: 13R/31L (3,000m)
    • CAT I ILS available
    • 24/7 operations
  2. Batumi International (BUS):
    • Runway: 13/31 (2,500m)
    • Limited night operations
  3. Kutaisi International (KUT):
    • Runway: 08/26 (2,500m)
    • Mainly LCC operations
Special Restrictions
  • Prior permission required for:
    • Dangerous goods
    • Night operations at regional airports
    • Military/special flights
  • Mountainous terrain considerations

Why Use Professional Permit Services?

Engaging specialists like The Network Plan provides:

  1. 98% Approval Rate
  2. Average 2-Day Processing
  3. Local GCAA Contacts
  4. Document Preparation Assistance
  5. 24/7 Application Tracking
Tips for Successful Applications
  1. Apply at least 5 business days in advance
  2. Ensure all documents are properly completed
  3. Confirm handling arrangements before applying
  4. Verify insurance meets Georgian requirements
  5. Check NOTAMs for temporary restrictions

Our Specialized Services

✔ Risk Assessment & Mitigation Planning


✔ Diplomatic Channel Coordination


✔ Emergency Contingency Development


✔ Alternative Route Optimization

Post-Approval Requirements

  1. Final Manifest Submission: 24 hours before flight

  2. Security Briefing: Mandatory for crew

  3. Handling Confirmation: From approved ground agent

  4. Payment Verification: All fees must be cleared

  5. Last-Minute NOTAM Check: Essential before departure

Optimize Your Georgia Landing Permit Strategy Today

At The Network Plan, we specialize in securing Georgia Civil Aviation Authority (CAA) overflight permits, ensuring smooth and compliant crossings for commercial, private, and cargo flights

Contact us for a Georgia Landing Permit audit or to discuss custom supply agreements!