Regional airport · Vanimo, Papua New Guinea

Vanimo

AYVNVAI
Elevation
10 ft
Coordinates
2°42′S 141°18′E
Local time
Pacific/Port Moresby

Photo: Bill Abbott · CC BY-SA 2.0 · Wikimedia Commons

Field information

AYVN runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Vanimo (AYVN/VAI) has one runway, 12/30, 5,775 ft (1,760 m) long of asphalt. Our OCC arranges ground handling, landing permits and fuel at AYVN, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Pacific/Port Moresby

  • Country

    Papua New Guinea

    PG

  • Municipality

    Vanimo

  • Elevation

    10 ft

  • Position

    -2.6926, 141.3028

Runways · AYVN

RunwayLengthWidthSurfaceLighting
12/305,775 ft (1,760 m)85 ftasphaltLighted

Flight support

Ground handling, permits & fuel at AYVN.

The Network Plan coordinates flight support at Vanimo (AYVN / VAI) in Vanimo, Papua New Guinea, through one 24/7 OCC desk. AYVN is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at AYVN

  1. 01

    Overflight & Landing Permits – Papua New Guinea

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Papua New Guinea. Applicable permit lead times for Papua New Guinea are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Papua New Guinea are managed end-to-end.

  2. 02

    Ground Handling at AYVN

    Direct FBO and handler coordination at AYVN covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at AYVN

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at AYVN is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to AYVN

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for AYVN: 2° 41′ 33″ S 141° 18′ 10″ E; elevation 10 ft.

  5. 05

    Crew & Passenger Services in Vanimo

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Vanimo. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at AYVN.

  6. 06

    Cargo Operations at AYVN

    Support for freighter operations into AYVN covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into AYVN?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Vanimo — one desk for the whole trip.