General aviation · Oyen, Canada

Oyen Municipal

CED3
Elevation
2,498 ft
Coordinates
51°20′N 110°29′W
Local time
America/Edmonton

Photo: U.S. Department of Defense · Public domain · Wikimedia Commons

Field information

CED3 runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Oyen Municipal (CED3) has 2 runways; the longest, 14/32, is 3,000 ft (914 m) of asphalt. Our OCC arranges ground handling, landing permits and fuel at CED3, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    General aviation

  • Time zone

    America/Edmonton

  • Country

    Canada

    CA

  • Municipality

    Oyen

  • Elevation

    2,498 ft

  • Position

    51.3342, -110.4910

Runways · CED3

RunwayLengthWidthSurfaceLighting
14/323,000 ft (914 m)75 ftasphaltLighted
04/222,200 ft (671 m)75 ftgraded earth—

Flight support

Ground handling, permits & fuel at CED3.

The Network Plan coordinates flight support at Oyen Municipal (CED3) in Oyen, Canada, through one 24/7 OCC desk. CED3 is listed in our network as a general aviation. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at CED3

  1. 01

    Overflight & Landing Permits – Canada

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Canada. Applicable permit lead times for Canada are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Canada are managed end-to-end.

  2. 02

    Ground Handling at CED3

    Direct FBO and handler coordination at CED3 covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at CED3

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at CED3 is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to CED3

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for CED3: 51° 20′ 3″ N 110° 29′ 28″ W; elevation 2498 ft.

  5. 05

    Crew & Passenger Services in Oyen

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Oyen. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at CED3.

  6. 06

    Cargo Operations at CED3

    Support for freighter operations into CED3 covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into CED3?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Oyen Municipal — one desk for the whole trip.