Regional airport · Akure, Nigeria

Akure

DNAKAKR
Elevation
1,100 ft
Coordinates
7°15′N 5°18′E
Local time
Africa/Lagos

Photo: Bill Abbott · CC BY-SA 2.0 · Wikimedia Commons

Field information

DNAK runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Akure (DNAK/AKR) has one runway, 03/21, 9,195 ft (2,803 m) long of asphalt. Fuel on the field: No fuel available. Rescue and fire-fighting cover is published as RFFS category 6. Our OCC arranges ground handling, landing permits and fuel at DNAK, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Africa/Lagos

  • Country

    Nigeria

    NG

  • Municipality

    Akure

  • Elevation

    1,100 ft

  • Position

    7.2467, 5.3010

  • Fuel

    No fuel available

  • Fire & rescue

    RFFS category 6

Runways · DNAK

RunwayLengthWidthSurfaceLighting
03/219,195 ft (2,803 m)148 ftasphalt—

Flight support

Ground handling, permits & fuel at DNAK.

The Network Plan coordinates flight support at Akure (DNAK / AKR) in Akure, Nigeria, through one 24/7 OCC desk. DNAK is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at DNAK

  1. 01

    Overflight & Landing Permits – Nigeria

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Nigeria. Applicable permit lead times for Nigeria are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Nigeria are managed end-to-end.

  2. 02

    Ground Handling at DNAK

    Direct FBO and handler coordination at DNAK covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at DNAK

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at DNAK is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to DNAK

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for DNAK: 7° 14′ 48″ N 5° 18′ 4″ E; elevation 1100 ft.

  5. 05

    Crew & Passenger Services in Akure

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Akure. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at DNAK.

  6. 06

    Cargo Operations at DNAK

    Support for freighter operations into DNAK covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into DNAK?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Akure — one desk for the whole trip.