International hub · Dortmund, Germany

Dortmund

EDLWDTM
Elevation
425 ft
Coordinates
51°31′N 7°37′E
Local time
Europe/Berlin

Photo: U.S. Department of Defense · Public domain · Wikimedia Commons

Field information

EDLW runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Dortmund (EDLW/DTM) has one runway, 06/24, 6,562 ft (2,000 m) long of asphalt. Fuel on the field: Jet A-1 & Avgas. Rescue and fire-fighting cover is published as RFFS category 7. Our OCC arranges ground handling, landing permits and fuel at EDLW, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    International hub

  • Time zone

    Europe/Berlin

  • Country

    Germany

    DE

  • Municipality

    Dortmund

  • Elevation

    425 ft

  • Position

    51.5183, 7.6122

  • Traffic level

    High

  • Fuel

    Jet A-1 & Avgas

  • Fire & rescue

    RFFS category 7

  • Airport category

    B

    Crew briefing required

Runways · EDLW

RunwayLengthWidthSurfaceLighting
06/246,562 ft (2,000 m)148 ftasphaltLighted

Flight support

Ground handling, permits & fuel at EDLW.

The Network Plan coordinates flight support at Dortmund (EDLW / DTM) in Dortmund, Germany, through one 24/7 OCC desk. EDLW is listed in our network as an international hub. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at EDLW

  1. 01

    Overflight & Landing Permits – Germany

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Germany. Applicable permit lead times for Germany are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Germany are managed end-to-end.

  2. 02

    Ground Handling at EDLW

    Direct FBO and handler coordination at EDLW covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at EDLW

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at EDLW is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to EDLW

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for EDLW: 51° 31′ 6″ N 7° 36′ 44″ E; elevation 425 ft.

  5. 05

    Crew & Passenger Services in Dortmund

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Dortmund. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at EDLW.

  6. 06

    Cargo Operations at EDLW

    Support for freighter operations into EDLW covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into EDLW?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Dortmund — one desk for the whole trip.