General aviation · Port Louis, Mauritius

Agalega Island

FIMAAHG
Elevation
4 ft
Coordinates
10°22′S 56°37′E
Local time
Indian/Mauritius

Photo: Bill Abbott · CC BY-SA 2.0 · Wikimedia Commons

Field information

FIMA runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

  • Classification

    General aviation

  • Time zone

    Indian/Mauritius

  • Country

    Mauritius

    MU

  • Municipality

    Vingt Cinq

  • Elevation

    4 ft

  • Position

    -10.3731, 56.6098

Flight support

Ground handling, permits & fuel at FIMA.

The Network Plan coordinates flight support at Agalega Island (FIMA / AHG) in Port Louis, Mauritius, through one 24/7 OCC desk. FIMA is listed in our network as a general aviation. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at FIMA

  1. 01

    Overflight & Landing Permits – Mauritius

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Mauritius. Applicable permit lead times for Mauritius are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Mauritius are managed end-to-end.

  2. 02

    Ground Handling at FIMA

    Direct FBO and handler coordination at FIMA covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at FIMA

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at FIMA is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to FIMA

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for FIMA: 10° 22′ 23″ S 56° 36′ 35″ E; elevation 4 ft.

  5. 05

    Crew & Passenger Services in Port Louis

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Port Louis. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at FIMA.

  6. 06

    Cargo Operations at FIMA

    Support for freighter operations into FIMA covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into FIMA?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Agalega Island — one desk for the whole trip.