Regional airport · Maroantsetra, Madagascar

Soanierama/Maroantsetra

FMNRWMN
Elevation
9 ft
Coordinates
15°26′S 49°41′E
Local time
Indian/Antananarivo

Photo: Bill Abbott · CC BY-SA 2.0 · Wikimedia Commons

Field information

FMNR runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Soanierama/Maroantsetra (FMNR/WMN) has one runway, 14/32, 4,265 ft (1,300 m) long of asphalt. Fuel on the field: No fuel available. Operating hours: 0400-1400. Our OCC arranges ground handling, landing permits and fuel at FMNR, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Indian/Antananarivo

  • Country

    Madagascar

    MG

  • Municipality

    Maroantsetra

  • Elevation

    9 ft

  • Position

    -15.4377, 49.6891

  • Fuel

    No fuel available

  • Operating hours

    0400-1400

Runways · FMNR

RunwayLengthWidthSurfaceLighting
14/324,265 ft (1,300 m)98 ftasphalt—

Flight support

Ground handling, permits & fuel at FMNR.

The Network Plan coordinates flight support at Soanierama/Maroantsetra (FMNR / WMN) in Maroantsetra, Madagascar, through one 24/7 OCC desk. FMNR is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at FMNR

  1. 01

    Overflight & Landing Permits – Madagascar

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Madagascar. Applicable permit lead times for Madagascar are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Madagascar are managed end-to-end.

  2. 02

    Ground Handling at FMNR

    Direct FBO and handler coordination at FMNR covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at FMNR

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at FMNR is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to FMNR

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for FMNR: 15° 26′ 16″ S 49° 41′ 21″ E; elevation 9 ft.

  5. 05

    Crew & Passenger Services in Maroantsetra

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Maroantsetra. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at FMNR.

  6. 06

    Cargo Operations at FMNR

    Support for freighter operations into FMNR covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into FMNR?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Soanierama/Maroantsetra — one desk for the whole trip.