Regional airport · M'Banza Congo, Angola

M'Banza Congo (Pedro Moises Artur)

FNBCSSY
Elevation
1,860 ft
Coordinates
6°16′S 14°15′E
Local time
Africa/Luanda

Photo: Bill Abbott · CC BY-SA 2.0 · Wikimedia Commons

Field information

FNBC runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

M'Banza Congo (Pedro Moises Artur) (FNBC/SSY) has one runway, 16/34, 5,905 ft (1,800 m) long of asphalt. Fuel on the field: Jet A-1 & Avgas. Our OCC arranges ground handling, landing permits and fuel at FNBC, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Africa/Luanda

  • Country

    Angola

    AO

  • Municipality

    Mbanza Congo

  • Elevation

    1,860 ft

  • Position

    -6.2699, 14.2470

  • Fuel

    Jet A-1 & Avgas

Runways · FNBC

RunwayLengthWidthSurfaceLighting
16/345,905 ft (1,800 m)98 ftasphalt—

Flight support

Ground handling, permits & fuel at FNBC.

The Network Plan coordinates flight support at M'Banza Congo (Pedro Moises Artur) (FNBC / SSY) in M'Banza Congo, Angola, through one 24/7 OCC desk. FNBC is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at FNBC

  1. 01

    Overflight & Landing Permits – Angola

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Angola. Applicable permit lead times for Angola are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Angola are managed end-to-end.

  2. 02

    Ground Handling at FNBC

    Direct FBO and handler coordination at FNBC covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at FNBC

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at FNBC is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to FNBC

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for FNBC: 6° 16′ 12″ S 14° 14′ 49″ E; elevation 1860 ft.

  5. 05

    Crew & Passenger Services in M'Banza Congo

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into M'Banza Congo. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at FNBC.

  6. 06

    Cargo Operations at FNBC

    Support for freighter operations into FNBC covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into FNBC?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at M'Banza Congo (Pedro Moises Artur) — one desk for the whole trip.