Regional airport · Arusha, Tanzania

Arusha

HTARARK
Elevation
4,550 ft
Coordinates
3°22′S 36°38′E
Local time
Africa/Dar es Salaam

Photo: Stephenmshields · CC BY-SA 4.0 · Wikimedia Commons

Field information

HTAR runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Arusha (HTAR/ARK) has one runway, 09/27, 5,377 ft (1,639 m) long of asphalt. Fuel on the field: Jet A-1 & Avgas. Rescue and fire-fighting cover is published as RFFS category 5. Operating hours: 0330-1600. Our OCC arranges ground handling, landing permits and fuel at HTAR, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Africa/Dar es Salaam

  • Country

    Tanzania

    TZ

  • Municipality

    Arusha

  • Elevation

    4,550 ft

  • Position

    -3.3678, 36.6333

  • Fuel

    Jet A-1 & Avgas

  • Fire & rescue

    RFFS category 5

  • Operating hours

    0330-1600

Runways · HTAR

RunwayLengthWidthSurfaceLighting
09/275,377 ft (1,639 m)105 ftasphalt—

Flight support

Ground handling, permits & fuel at HTAR.

The Network Plan coordinates flight support at Arusha (HTAR / ARK) in Arusha, Tanzania, through one 24/7 OCC desk. HTAR is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at HTAR

  1. 01

    Overflight & Landing Permits – Tanzania

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Tanzania. Applicable permit lead times for Tanzania are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Tanzania are managed end-to-end.

  2. 02

    Ground Handling at HTAR

    Direct FBO and handler coordination at HTAR covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at HTAR

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at HTAR is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to HTAR

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for HTAR: 3° 22′ 4″ S 36° 38′ 0″ E; elevation 4550 ft.

  5. 05

    Crew & Passenger Services in Arusha

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Arusha. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at HTAR.

  6. 06

    Cargo Operations at HTAR

    Support for freighter operations into HTAR covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into HTAR?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Arusha — one desk for the whole trip.