Regional airport · Sirnak, Türkiye

Sirnak/Serafettin Elci

LTCVNKT
Elevation
2,038 ft
Coordinates
37°22′N 42°03′E
Local time
Europe/Istanbul

Photo: Bill Abbott · CC BY-SA 2.0 · Wikimedia Commons

Field information

LTCV runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Sirnak/Serafettin Elci (LTCV/NKT) has one runway, 11/29, 9,843 ft (3,000 m) long of concrete. Fuel on the field: Jet A-1 only. Rescue and fire-fighting cover is published as RFFS category 7. Our OCC arranges ground handling, landing permits and fuel at LTCV, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Europe/Istanbul

  • Country

    Türkiye

    TR

  • Municipality

    Şırnak

  • Elevation

    2,038 ft

  • Position

    37.3647, 42.0582

  • Traffic level

    High

  • Fuel

    Jet A-1 only

  • Fire & rescue

    RFFS category 7

Runways · LTCV

RunwayLengthWidthSurfaceLighting
11/299,843 ft (3,000 m)148 ftconcrete—

Flight support

Ground handling, permits & fuel at LTCV.

The Network Plan coordinates flight support at Sirnak/Serafettin Elci (LTCV / NKT) in Sirnak, Turkey, through one 24/7 OCC desk. LTCV is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at LTCV

  1. 01

    Overflight & Landing Permits – Turkey

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Turkey. Applicable permit lead times for Turkey are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Turkey are managed end-to-end.

  2. 02

    Ground Handling at LTCV

    Direct FBO and handler coordination at LTCV covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at LTCV

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at LTCV is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to LTCV

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for LTCV: 37° 21′ 53″ N 42° 3′ 30″ E; elevation 2038 ft.

  5. 05

    Crew & Passenger Services in Sirnak

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Sirnak. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at LTCV.

  6. 06

    Cargo Operations at LTCV

    Support for freighter operations into LTCV covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into LTCV?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Sirnak/Serafettin Elci — one desk for the whole trip.