General aviation · Popt, Guatemala

Popt

MGPPPON
Elevation
1,801 ft
Coordinates
16°20′N 89°25′W
Local time
America/Guatemala

Photo: Paullymac · CC BY-SA 3.0 · Wikimedia Commons

Field information

MGPP runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Popt (MGPP/PON) has one runway, 09/27, 8,000 ft (2,438 m) long. Operating hours: Sunrise to sunset. Our OCC arranges ground handling, landing permits and fuel at MGPP, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    General aviation

  • Time zone

    America/Guatemala

  • Country

    Guatemala

    GT

  • Municipality

    Poptún

  • Elevation

    1,801 ft

  • Position

    16.3258, -89.4161

  • Operating hours

    Sunrise to sunset

Runways · MGPP

RunwayLengthWidthSurfaceLighting
09/278,000 ft (2,438 m)———

Flight support

Ground handling, permits & fuel at MGPP.

The Network Plan coordinates flight support at Popt (MGPP / PON) in Popt, Guatemala, through one 24/7 OCC desk. MGPP is listed in our network as a general aviation. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at MGPP

  1. 01

    Overflight & Landing Permits – Guatemala

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Guatemala. Applicable permit lead times for Guatemala are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Guatemala are managed end-to-end.

  2. 02

    Ground Handling at MGPP

    Direct FBO and handler coordination at MGPP covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at MGPP

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at MGPP is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to MGPP

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for MGPP: 16° 19′ 33″ N 89° 24′ 58″ W; elevation 1801 ft.

  5. 05

    Crew & Passenger Services in Popt

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Popt. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at MGPP.

  6. 06

    Cargo Operations at MGPP

    Support for freighter operations into MGPP covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into MGPP?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Popt — one desk for the whole trip.