General aviation · Nicoya, Costa Rica

Nicoya/La Guinea

MRLN
Elevation
33 ft
Coordinates
10°25′N 85°28′W
Local time
America/Costa Rica

Photo: Bill Abbott · CC BY-SA 2.0 · Wikimedia Commons

Field information

MRLN runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

  • Classification

    General aviation

  • Time zone

    America/Costa Rica

  • Country

    Costa Rica

    CR

  • Municipality

    Nicoya

  • Elevation

    33 ft

  • Position

    10.4207, -85.4720

Flight support

Ground handling, permits & fuel at MRLN.

The Network Plan coordinates flight support at Nicoya/La Guinea (MRLN) in Nicoya, Costa Rica, through one 24/7 OCC desk. MRLN is listed in our network as a general aviation. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at MRLN

  1. 01

    Overflight & Landing Permits – Costa Rica

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Costa Rica. Applicable permit lead times for Costa Rica are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Costa Rica are managed end-to-end.

  2. 02

    Ground Handling at MRLN

    Direct FBO and handler coordination at MRLN covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at MRLN

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at MRLN is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to MRLN

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for MRLN: 10° 25′ 15″ N 85° 28′ 19″ W; elevation 33 ft.

  5. 05

    Crew & Passenger Services in Nicoya

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Nicoya. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at MRLN.

  6. 06

    Cargo Operations at MRLN

    Support for freighter operations into MRLN covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into MRLN?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Nicoya/La Guinea — one desk for the whole trip.