General aviation · Attu Island, United States

Casco Cove

PAATATU
Elevation
40 ft
Coordinates
52°50′N 173°10′E
Local time
America/Adak

Photo: Paullymac · CC BY-SA 3.0 · Wikimedia Commons

Field information

PAAT runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

  • Classification

    General aviation

  • Time zone

    America/Adak

  • Country

    United States

    US

  • Municipality

    Attu

  • Elevation

    40 ft

  • Position

    52.8298, 173.1738

Flight support

Ground handling, permits & fuel at PAAT.

The Network Plan coordinates flight support at Casco Cove (PAAT / ATU) in Attu Island, United States of America, through one 24/7 OCC desk. PAAT is listed in our network as a general aviation. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at PAAT

  1. 01

    Overflight & Landing Permits – United States of America

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of United States of America. Applicable permit lead times for United States of America are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for United States of America are managed end-to-end.

  2. 02

    Ground Handling at PAAT

    Direct FBO and handler coordination at PAAT covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at PAAT

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at PAAT is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to PAAT

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for PAAT: 52° 49′ 47″ N 173° 10′ 26″ E; elevation 40 ft.

  5. 05

    Crew & Passenger Services in Attu Island

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Attu Island. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at PAAT.

  6. 06

    Cargo Operations at PAAT

    Support for freighter operations into PAAT covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into PAAT?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Casco Cove — one desk for the whole trip.