Regional airport · Utopia Creek, United States

Indian Mountain LRRS

PAIMUTO
Elevation
1,273 ft
Coordinates
65°60′N 153°42′W
Local time
America/Anchorage

Photo: JarrahTree · CC BY 2.5 AU · Wikimedia Commons

Field information

PAIM runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Indian Mountain LRRS (PAIM/UTO) has one runway, 07/25, 4,100 ft (1,250 m) long of gravel. Our OCC arranges ground handling, landing permits and fuel at PAIM, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    America/Anchorage

  • Country

    United States

    US

  • Municipality

    Utopia Creek

  • Elevation

    1,273 ft

  • Position

    65.9928, -153.7040

Runways · PAIM

RunwayLengthWidthSurfaceLighting
07/254,100 ft (1,250 m)150 ftgravelLighted

Flight support

Ground handling, permits & fuel at PAIM.

The Network Plan coordinates flight support at Indian Mountain LRRS (PAIM / UTO) in Utopia Creek, United States of America, through one 24/7 OCC desk. PAIM is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at PAIM

  1. 01

    Overflight & Landing Permits – United States of America

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of United States of America. Applicable permit lead times for United States of America are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for United States of America are managed end-to-end.

  2. 02

    Ground Handling at PAIM

    Direct FBO and handler coordination at PAIM covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at PAIM

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at PAIM is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to PAIM

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for PAIM: 65° 59′ 34″ N 153° 42′ 14″ W; elevation 1273 ft.

  5. 05

    Crew & Passenger Services in Utopia Creek

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Utopia Creek. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at PAIM.

  6. 06

    Cargo Operations at PAIM

    Support for freighter operations into PAIM covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into PAIM?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Indian Mountain LRRS — one desk for the whole trip.