General aviation · Presidente R S Pena, Argentina

Presidente Roque S Pena/Termal

SARSPRQ
Elevation
308 ft
Coordinates
26°45′S 60°30′W
Local time
America/Argentina/Cordoba

Photo: Noj Han · CC BY-SA 2.0 · Wikimedia Commons

Field information

SARS runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Presidente Roque S Pena/Termal (SARS/PRQ) has one runway, 03/21, 5,905 ft (1,800 m) long of concrete. Our OCC arranges ground handling, landing permits and fuel at SARS, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    General aviation

  • Time zone

    America/Argentina/Cordoba

  • Country

    Argentina

    AR

  • Municipality

    Presidencia Roque Sáenz Peña

  • Elevation

    308 ft

  • Position

    -26.7536, -60.4922

  • Traffic level

    Low

Runways · SARS

RunwayLengthWidthSurfaceLighting
03/215,905 ft (1,800 m)108 ftconcreteLighted

Flight support

Ground handling, permits & fuel at SARS.

The Network Plan coordinates flight support at Presidente Roque S Pena/Termal (SARS / PRQ) in Presidente R S Pena, Argentina, through one 24/7 OCC desk. SARS is listed in our network as a general aviation. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at SARS

  1. 01

    Overflight & Landing Permits – Argentina

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Argentina. Applicable permit lead times for Argentina are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Argentina are managed end-to-end.

  2. 02

    Ground Handling at SARS

    Direct FBO and handler coordination at SARS covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at SARS

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at SARS is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to SARS

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for SARS: 26° 45′ 13″ S 60° 29′ 32″ W; elevation 308 ft.

  5. 05

    Crew & Passenger Services in Presidente R S Pena

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Presidente R S Pena. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at SARS.

  6. 06

    Cargo Operations at SARS

    Support for freighter operations into SARS covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into SARS?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Presidente Roque S Pena/Termal — one desk for the whole trip.