Regional airport · Nakhon Phanom, Thailand

Nakhon Phanom

VTUWKOP
Elevation
587 ft
Coordinates
17°23′N 104°39′E
Local time
Asia/Bangkok

Photo: U.S. Department of Defense · Public domain · Wikimedia Commons

Field information

VTUW runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Nakhon Phanom (VTUW/KOP) has one runway, 15/33, 8,203 ft (2,500 m) long of asphalt. Fuel on the field: No fuel available. Rescue and fire-fighting cover is published as RFFS category 7. Our OCC arranges ground handling, landing permits and fuel at VTUW, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Asia/Bangkok

  • Country

    Thailand

    TH

  • Municipality

    Nakhon Phanom

  • Elevation

    587 ft

  • Position

    17.3838, 104.6430

  • Traffic level

    High

  • Fuel

    No fuel available

  • Fire & rescue

    RFFS category 7

Runways · VTUW

RunwayLengthWidthSurfaceLighting
15/338,203 ft (2,500 m)148 ftasphaltLighted

Flight support

Ground handling, permits & fuel at VTUW.

The Network Plan coordinates flight support at Nakhon Phanom (VTUW / KOP) in Nakhon Phanom, Thailand, through one 24/7 OCC desk. VTUW is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at VTUW

  1. 01

    Overflight & Landing Permits – Thailand

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Thailand. Applicable permit lead times for Thailand are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Thailand are managed end-to-end.

  2. 02

    Ground Handling at VTUW

    Direct FBO and handler coordination at VTUW covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at VTUW

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at VTUW is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to VTUW

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for VTUW: 17° 23′ 2″ N 104° 38′ 35″ E; elevation 587 ft.

  5. 05

    Crew & Passenger Services in Nakhon Phanom

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Nakhon Phanom. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at VTUW.

  6. 06

    Cargo Operations at VTUW

    Support for freighter operations into VTUW covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into VTUW?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Nakhon Phanom — one desk for the whole trip.