Regional airport · Putao, Myanmar (Burma)

Putao

VYPTPBU
Elevation
1,500 ft
Coordinates
27°20′N 97°26′E
Local time
Asia/Yangon

Photo: JarrahTree · CC BY 2.5 AU · Wikimedia Commons

Field information

VYPT runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Putao (VYPT/PBU) has one runway, 17/35, 7,002 ft (2,134 m) long of asphalt. Rescue and fire-fighting cover is published as RFFS category 3. Our OCC arranges ground handling, landing permits and fuel at VYPT, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Asia/Yangon

  • Country

    Myanmar (Burma)

    MM

  • Municipality

    Putao

  • Elevation

    1,500 ft

  • Position

    27.3299, 97.4263

  • Fire & rescue

    RFFS category 3

Runways · VYPT

RunwayLengthWidthSurfaceLighting
17/357,002 ft (2,134 m)102 ftasphaltLighted

Flight support

Ground handling, permits & fuel at VYPT.

The Network Plan coordinates flight support at Putao (VYPT / PBU) in Putao, Myanmar, through one 24/7 OCC desk. VYPT is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at VYPT

  1. 01

    Overflight & Landing Permits – Myanmar

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Myanmar. Applicable permit lead times for Myanmar are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Myanmar are managed end-to-end.

  2. 02

    Ground Handling at VYPT

    Direct FBO and handler coordination at VYPT covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at VYPT

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at VYPT is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to VYPT

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for VYPT: 27° 19′ 48″ N 97° 25′ 35″ E; elevation 1500 ft.

  5. 05

    Crew & Passenger Services in Putao

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Putao. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at VYPT.

  6. 06

    Cargo Operations at VYPT

    Support for freighter operations into VYPT covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into VYPT?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Putao — one desk for the whole trip.