General aviation · Turtle Park, Australia

Turtle Park

YTPKVX3
Elevation
120 ft
Coordinates
21°13′S 148°59′E
Local time
Australia/Brisbane

Photo: Stephenmshields · CC BY-SA 4.0 · Wikimedia Commons

Field information

YTPK runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Prior permission required (PPR): our OCC requests it with the handler or airport authority. Our OCC arranges ground handling, landing permits and fuel at YTPK, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    General aviation

  • Time zone

    Australia/Brisbane

  • Country

    Australia

    AU

  • Municipality

    Turtle Park

  • Elevation

    120 ft

  • Position

    -21.2084, 148.9783

  • Access

    Prior permission required (PPR)

Flight support

Ground handling, permits & fuel at YTPK.

The Network Plan coordinates flight support at TURTLE PARK (YTPK / VX3) in Turtle Park, Australia, through one 24/7 OCC desk. YTPK is listed in our network as a general aviation. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at YTPK

  1. 01

    Overflight & Landing Permits – Australia

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Australia. Applicable permit lead times for Australia are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Australia are managed end-to-end.

  2. 02

    Ground Handling at YTPK

    Direct FBO and handler coordination at YTPK covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at YTPK

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at YTPK is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to YTPK

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for YTPK: 21° 12′ 30″ S 148° 58′ 42″ E; elevation 120 ft.

  5. 05

    Crew & Passenger Services in Turtle Park

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Turtle Park. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at YTPK.

  6. 06

    Cargo Operations at YTPK

    Support for freighter operations into YTPK covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into YTPK?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Turtle Park — one desk for the whole trip.