Regional airport · Hotan, China

Hotan

ZWTNHTN
Elevation
4,672 ft
Coordinates
37°02′N 79°52′E
Local time
Asia/Shanghai

Photo: Bill Abbott · CC BY-SA 2.0 · Wikimedia Commons

Field information

ZWTN runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Hotan (ZWTN/HTN) has one runway, 11/29, 10,499 ft (3,200 m) long of concrete. Fuel on the field: No fuel available. Rescue and fire-fighting cover is published as RFFS category 6. Our OCC arranges ground handling, landing permits and fuel at ZWTN, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Asia/Shanghai

  • Country

    China

    CN

  • Municipality

    Hotan

  • Elevation

    4,672 ft

  • Position

    37.0385, 79.8649

  • Traffic level

    High

  • Fuel

    No fuel available

  • Fire & rescue

    RFFS category 6

Runways · ZWTN

RunwayLengthWidthSurfaceLighting
11/2910,499 ft (3,200 m)164 ftconcreteLighted

Flight support

Ground handling, permits & fuel at ZWTN.

The Network Plan coordinates flight support at Hotan (ZWTN / HTN) in Hotan, China, through one 24/7 OCC desk. ZWTN is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at ZWTN

  1. 01

    Overflight & Landing Permits – China

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of China. Applicable permit lead times for China are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for China are managed end-to-end.

  2. 02

    Ground Handling at ZWTN

    Direct FBO and handler coordination at ZWTN covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at ZWTN

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at ZWTN is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to ZWTN

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for ZWTN: 37° 2′ 19″ N 79° 51′ 54″ E; elevation 4672 ft.

  5. 05

    Crew & Passenger Services in Hotan

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Hotan. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at ZWTN.

  6. 06

    Cargo Operations at ZWTN

    Support for freighter operations into ZWTN covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into ZWTN?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Hotan — one desk for the whole trip.