Regional airport · Ibadan, Nigeria

Ibadan/New Ibadan

DNIBIBA
Elevation
725 ft
Coordinates
7°22′N 3°59′E
Local time
Africa/Lagos

Photo: Stephenmshields · CC BY-SA 4.0 · Wikimedia Commons

Field information

DNIB runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Ibadan/New Ibadan (DNIB/IBA) has one runway, 05/23, 7,875 ft (2,400 m) long of asphalt. Fuel on the field: No fuel available. Operating hours: Dly 0600-1800. Our OCC arranges ground handling, landing permits and fuel at DNIB, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Africa/Lagos

  • Country

    Nigeria

    NG

  • Municipality

    Ibadan

  • Elevation

    725 ft

  • Position

    7.3625, 3.9783

  • Fuel

    No fuel available

  • Operating hours

    Dly 0600-1800

Runways · DNIB

RunwayLengthWidthSurfaceLighting
05/237,875 ft (2,400 m)147 ftasphaltLighted

Flight support

Ground handling, permits & fuel at DNIB.

The Network Plan coordinates flight support at Ibadan/New Ibadan (DNIB / IBA) in Ibadan, Nigeria, through one 24/7 OCC desk. DNIB is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at DNIB

  1. 01

    Overflight & Landing Permits – Nigeria

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Nigeria. Applicable permit lead times for Nigeria are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Nigeria are managed end-to-end.

  2. 02

    Ground Handling at DNIB

    Direct FBO and handler coordination at DNIB covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at DNIB

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at DNIB is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to DNIB

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for DNIB: 7° 21′ 45″ N 3° 58′ 42″ E; elevation 725 ft.

  5. 05

    Crew & Passenger Services in Ibadan

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Ibadan. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at DNIB.

  6. 06

    Cargo Operations at DNIB

    Support for freighter operations into DNIB covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into DNIB?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Ibadan/New Ibadan — one desk for the whole trip.