General aviation · Del Carmen, Philippines

Sayak/Siargao Island

RPNSIAO
Elevation
10 ft
Coordinates
9°52′N 126°01′E
Local time
Asia/Manila

Photo: JarrahTree · CC BY 2.5 AU · Wikimedia Commons

Field information

RPNS runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Sayak/Siargao Island (RPNS/IAO) has one runway, 01/19, 4,167 ft (1,270 m) long of concrete. Rescue and fire-fighting cover is published as RFFS category 4. Our OCC arranges ground handling, landing permits and fuel at RPNS, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    General aviation

  • Time zone

    Asia/Manila

  • Country

    Philippines

    PH

  • Municipality

    Del Carmen

  • Elevation

    10 ft

  • Position

    9.8591, 126.0140

  • Fire & rescue

    RFFS category 4

Runways · RPNS

RunwayLengthWidthSurfaceLighting
01/194,167 ft (1,270 m)98 ftconcrete—

Flight support

Ground handling, permits & fuel at RPNS.

The Network Plan coordinates flight support at Sayak/Siargao Island (RPNS / IAO) in Del Carmen, Philippines, through one 24/7 OCC desk. RPNS is listed in our network as a general aviation. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at RPNS

  1. 01

    Overflight & Landing Permits – Philippines

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Philippines. Applicable permit lead times for Philippines are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Philippines are managed end-to-end.

  2. 02

    Ground Handling at RPNS

    Direct FBO and handler coordination at RPNS covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at RPNS

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at RPNS is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to RPNS

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for RPNS: 9° 51′ 33″ N 126° 0′ 50″ E; elevation 10 ft.

  5. 05

    Crew & Passenger Services in Del Carmen

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Del Carmen. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at RPNS.

  6. 06

    Cargo Operations at RPNS

    Support for freighter operations into RPNS covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into RPNS?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Sayak/Siargao Island — one desk for the whole trip.