Regional airport · Suai, Timor-Leste

Suai/Xanana Gusmao International

WPDBUAI
Elevation
96 ft
Coordinates
9°18′S 125°17′E
Local time
Asia/Dili

Photo: Paullymac · CC BY-SA 3.0 · Wikimedia Commons

Field information

WPDB runways, fuel & airport data

Reference data compiled from public aeronautical sources. Our OCC confirms the operational details for your flight before dispatch.

Suai/Xanana Gusmao International (WPDB/UAI) has one runway, 16/34, 4,921 ft (1,500 m) long of asphalt. Our OCC arranges ground handling, landing permits and fuel at WPDB, and confirms every figure on this page with the airport and handler before dispatch.

  • Classification

    Regional airport

  • Time zone

    Asia/Dili

  • Country

    Timor-Leste

    TL

  • Municipality

    Suai

  • Elevation

    96 ft

  • Position

    -9.3019, 125.2863

Runways · WPDB

RunwayLengthWidthSurfaceLighting
16/344,921 ft (1,500 m)98 ftasphaltLighted

Flight support

Ground handling, permits & fuel at WPDB.

The Network Plan coordinates flight support at Suai/Xanana Gusmao International (WPDB / UAI) in Suai, Timor-Leste, through one 24/7 OCC desk. WPDB is listed in our network as a regional airport. Before dispatch, our OCC verifies permit lead times, slot availability, and local handler capabilities.

Services coordinated at WPDB

  1. 01

    Overflight & Landing Permits – Timor-Leste

    Efficient coordination of overflight, landing, ad hoc, and seasonal block permit applications with the civil aviation authority of Timor-Leste. Applicable permit lead times for Timor-Leste are confirmed by the duty dispatcher at the time of request. For airline operators, navigation fee verifications, overflight charge audits, and CAA account reconciliations for Timor-Leste are managed end-to-end.

  2. 02

    Ground Handling at WPDB

    Direct FBO and handler coordination at WPDB covering ramp parking, towing, GPU/ACU support, CIQ formalities, and real-time operational updates.

  3. 03

    Fuel Arrangements at WPDB

    Competitive into-plane pricing, secure fuel releases, and credit arrangements through major oil suppliers and local distributors worldwide. Availability at WPDB is confirmed by the duty dispatcher at the time of request.

  4. 04

    Flight Planning & Dispatch to WPDB

    Optimized routing, weather analysis, NOTAM review, fuel planning, and flight plan filing supported by continuous 24/7 OCC monitoring. Planning reference for WPDB: 9° 18′ 7″ S 125° 17′ 11″ E; elevation 96 ft.

  5. 05

    Crew & Passenger Services in Suai

    Ground transportation, hotel reservations, visa assistance, and expedited meet & greet for crews operating into Suai. Complete passenger handling coordination covering check-in, boarding, special assistance, and CIQ formalities at WPDB.

  6. 06

    Cargo Operations at WPDB

    Support for freighter operations into WPDB covering ULD logistics, ramp and slot coordination, dangerous goods coordination, and rapid turnarounds.

Operating into WPDB?

Our 24/7 OCC arranges permits, ground handling, fuel and crew support at Suai/Xanana Gusmao International — one desk for the whole trip.